Duct Fittings Production & Metal Processing Manufacturer From China
Recent Posts
Installer for clamp together ductwork
Release time:
Jul 18,2022
Assembly on the welding plate Before assembly, in order to better determine the direction of the clamp, it is recommended to mark the fixing place first, then weld it, insert the lower part of the clamp together ductwork, and place the pipe to be fixed. Then put the other half of the clamp together ductwork body and cover plate, and tighten with screws. Do not directly weld the bottom plate with clamp together ductwork installed.
Assembly on the welding plate Before assembly, in order to better determine the direction of the clamp, it is recommended to mark the fixing place first, then weld it, insert the lower part of the clamp together ductwork, and place the pipe to be fixed. Then put the other half of the clamp together ductwork body and cover plate, and tighten with screws. Do not directly weld the bottom plate with clamp together ductwork installed.
For stacking assembly, the guide rail can be welded on the foundation, or fixed with screws. First install the upper and lower half of the clamp together ductwork, put the pipe to be fixed, and then put the upper half of the clamp together ductwork, fix it with screws, and prevent from loosening. The cover prevents it from turning. Then install the second clamp together ductwork in the same way.
Assembly of the elbow, when assembling the elbow, it should be fixed with clamp together ductwork directly at the front and rear of the elbow.
keywords
Contact Us
Tel: +86-311-85612775
WhatsApp: +86-15028109230
E-mail: info@ypmachinery.com
Address: 2-201,Fangda Tech Park ,No.266 Tianshan Street, Shijiazhuang City,Hebei Province, China
Our Products
We produce all kinds of metal parts include machine parts, metal stamping, deep drawn, sheet fabrication, welding parts, and assemble products
Follow us
