Duct Fittings Production & Metal Processing Manufacturer From China
Recent Posts
The manufacturer of ductwork clamps introduces how to install ductwork clamps effectively and reasonably
Release time:
Mar 15,2023
Place the ductwork clamps and the other half of the cover and tighten with screws. Do not solder the chuck base plate directly.

1. Before assembly on the welding plate, in order to better determine the direction of the chuck, it is recommended to mark the chuck at the fixed position, then weld, insert the lower part of the chuck body, and then put the pipe to be fixed. Place the ductwork clamps and the other half of the cover and tighten with screws. Do not solder the chuck base plate directly.
2. On the ground installation guide rail, the guide rail can be welded on the foundation or fixed with screws. Then push the rail nut into the rail and turn it 90 degrees. The lower part of the ductwork clamps is embedded in the nut, and the ductwork clamps and cover plate to be fixed are installed on the upper part of the ductwork clamps and fixed with screws.
3. Overlay assembly. The guide rail can be welded on the foundation or fixed with screws. First install the upper and lower parts of the ductwork clamps, then place the upper part of the ductwork clamps on the pipe to be fixed, fix it with screws, and prevent it from rotating with a loose cover. Then install two ductwork clamps in the same way as above.
4. Assembling the elbow, when assembling the elbow, it should be directly fixed with ductwork clamps on the front and rear of the elbow. It is recommended that such support points should be in fixed positions.
keywords
Previous Page:
Previous Page:
Contact Us
Tel: +86-311-85612775
WhatsApp: +86-15028109230
E-mail: info@ypmachinery.com
Address: 2-201,Fangda Tech Park ,No.266 Tianshan Street, Shijiazhuang City,Hebei Province, China
Our Products
We produce all kinds of metal parts include machine parts, metal stamping, deep drawn, sheet fabrication, welding parts, and assemble products
Follow us
