+86-311-85612775

+86-311-85329078

info@ypmachinery.com

 2-201,Fangda Tech Park ,No.266 Tianshan Street, Shijiazhuang

City,Hebei Province, China

 

Hebei Yunpeng Machinery is a leading enterprise

whose metal parts and duct fittings production.

CONTACT US

COPYRIGHT © 2018 Hebei Yunpeng Machinery Co., Ltd.
 
>
>
>
Installation steps for quality ductwork clamps
Company news
Industry news
web is updating and upgrading
Exhibition
Exhibition

Installation steps for quality ductwork clamps

1. Before assembling on the welding plate, in order to better determine the direction of the clamp, it is recommended to mark the fixing place first, then weld it, insert the lower part of the quality ductwork clamps, and place the pipe to be fixed. Put the other half of the quality ductwork clamps on the body and cover, and tighten with screws. Never directly weld the base plate with quality ductwork clamps installed.

quality ductwork clamps

2. Install the guide rail on the ground, the guide rail can be welded on the foundation, or fixed with screws, then push the guide nut into the rail, and turn it 90 degrees, insert the lower half of the quality ductwork clamps into the nut, and put the pipe to be fixed. , and then put the upper half of the tube quality ductwork clamps body and cover plate, and fix it with screws.

3. Stacked assembly, the guide rail can be welded on the foundation, or fixed with screws, first install the upper and lower half of the quality ductwork clamps, put the pipe to be fixed, then put the upper half of the quality ductwork clamps, fix with screws, pass A locking cover prevents it from turning. Then install two quality ductwork clamps in the same way as above.